Work Bee Sunday Sept 8th, 2013

Correction to last posting: Work bee is on Sunday Sept 8th, 2013, not Sept 6th

Please come join us in a day of community-building work.  Our main project is to develop kuti meditation walking paths.  The heavy lifting will be done by our tractor bucket, however help is needed to smooth out gravel and dirt, as well as line the paths with logs.  Lighter work is also needed, in the way of trimming branches with loppers.

The Work Bee starts at 8:30am.  A potluck lunch will be served at 11am.  Afternoon work resumes at 1pm, ending at 4pm.

The weather isn’t too hot, there have virtually no insects at this time, and it’s a great time for outdoor work!

Leave a Reply